CRYOGENIC FLOW CONTROLS (CFC VIETNAM)
[A] : 9th Floor, C.T Building, 56 Yen The Str., Ward 2, Tan Binh Dist., HCMC, Vietnam
[P] : (+84) 28 5449 2068 - [F] : (+84) 28 5449 2069
[E] : hung.nguyen@cfc-vietnam.vn
[W] : www.cfc-vietnam.vn
After 3 years in operation without doing any maintenance. The compressor needed to be clean, changing dusty elements such air filter, oil filter. Oil - the most heating and wearing parts - must be changed to ensure the system working properly and maintain lifetime of the compressor.
Oil Filter Change
Oil Change, make sure to maintain the Oil pressure in the system before re-startup
Visual Checking before putting back into operation
Putting into Operation